CRANE MARINE CONTRACTOR
Рус ENG search
Fleet

Descent of the SME13 blocks 07.2021

In the summer of 2021, as part of the construction of the "Arrangement of the Kamennomysskoye-More gas field" by the Volgar floating crane, CME 13 blocks were launched from the sites of JSC "UCSS" and JSC "ASPO", which are components of the support base of the LSP "A". After the blocks were docked in pairs, with the help of the involved tugs, they were transported to the port of Kaliningrad for further formation of the supporting base of the platform.